{"id":1285,"date":"2025-01-03T00:00:00","date_gmt":"2025-01-03T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/cneec-completes-first-substation-for-world-bank-project-in-bangladesh\/"},"modified":"2025-01-03T00:00:00","modified_gmt":"2025-01-03T00:00:00","slug":"cneec-completes-first-substation-for-world-bank-project-in-bangladesh","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/de\/news\/cneec-completes-first-substation-for-world-bank-project-in-bangladesh\/","title":{"rendered":"CNEEC schlie\u00dft erste Schaltanlage f\u00fcr Weltbank-Projekt in Bangladesch ab"},"content":{"rendered":"<div>\n<p>Recently, the World Bank substation project in Bangladesh has reached an important milestone. The Muradnagar 132kV\/33kV<\/p>\n<p>gas-insulated metal-enclosed switchgear (GIS) substation constructed by China Energy Engineering Corporation (CNEEC) has<\/p>\n<p>been successfully delivered. This move marks significant progress in the project and makes an important contribution to the<\/p>\n<p>improvement of the local power supply network.<\/p>\n<p>\u00a0<\/p>\n<p>The successful delivery of this substation laid a solid foundation for the installation and commissioning of subsequent substations,<\/p>\n<p>and also accumulated valuable experience for the construction and handover of similar projects in the future. During the project<\/p>\n<p>implementation process, the CNEEC project team always adhered to the principles of optimizing the process, ensuring quality,<\/p>\n<p>and strictly adhering to the construction deadline, ensuring the smooth delivery of the substation.<\/p>\n<p>\u00a0<\/p>\n<p>As the first substation of the World Bank project in Bangladesh, the successful delivery of Muradnagar substation not only<\/p>\n<p>improved the level of local power infrastructure, but also injected strong impetus into the subsequent advancement of the project.<\/p>\n<p>CNEEC will continue to uphold professionalism and be committed to promoting the comprehensive completion of the project and<\/p>\n<p>contributing to the development of Bangladesh\u2019s power industry.<\/p>\n<p>\u00a0<\/p>\n<p>The successful implementation of this project once again demonstrates CNEEC\u2019s professional strength and rich experience in the<\/p>\n<p>field of power infrastructure construction. In the future, CNEEC will continue to delve into the international market and provide<\/p>\n<p>strong support for the development of the electric power industry in more countries and regions.<\/p>\n<\/div>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>Recently, the World Bank substation project in Bangladesh has reached an important milestone. The Muradnagar 132kV\/33kV gas-insulated metal-enclosed switchgear (GIS) substation constructed by China Energy Engineering Corporation (CNEEC) has<\/p>","protected":false},"author":1,"featured_media":928,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1285","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/posts\/1285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/comments?post=1285"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/posts\/1285\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/media\/928"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/media?parent=1285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/categories?post=1285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/tags?post=1285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}