{"id":1345,"date":"2024-03-16T00:00:00","date_gmt":"2024-03-16T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/pakistans-merah-dc-transmission-projects-first-large-scale-comprehensive-maintenance-completed\/"},"modified":"2024-03-16T00:00:00","modified_gmt":"2024-03-16T00:00:00","slug":"pakistans-merah-dc-transmission-projects-first-large-scale-comprehensive-maintenance-completed","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/de\/news\/pakistans-merah-dc-transmission-projects-first-large-scale-comprehensive-maintenance-completed\/","title":{"rendered":"Pakistan\u2019s Merah DC Transmission Project\u2019s First Large-Scale Comprehensive Maintenance Completed"},"content":{"rendered":"<p><a href=\"\/de\/uploads\/202309221105556271.jpg\/\"><img alt=\"20230922110555627\" decoding=\"async\" height=\"199\" loading=\"lazy\" src=\"\/assets\/article-restoration\/8c54c3b75b79aab4b316c40a.jpg\" width=\"300\"\/><\/a><\/p>\n<p>\u00a0<\/p>\n<p><span>After the Merah DC Transmission Project in Pakistan was put into commercial operation, the first large-scale comprehensive <\/span><\/p>\n<p><span>maintenance work was successfully completed. The maintenance was carried out in the \u201c4+4+2\u2033 bipolar wheel stop and bipolar<\/span><\/p>\n<p><span> co-stop mode, which lasted 10 days. The total bipolar power outage time was 124.4 hours, saving 13.6 hours compared with the<\/span><\/p>\n<p><span> original plan. During this period, the maintenance team performed a total of 1,719 maintenance tests on converter stations and<\/span><\/p>\n<p><span> DC lines, and eliminated a total of 792 defects.<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>China Electric Power Technology and Equipment Co., Ltd. and Pakistan Merah Transmission Company jointly formulated a <\/span><\/p>\n<p><span>maintenance plan through careful planning and collaboration. At the same time, both parties actively mobilized the maintenance <\/span><\/p>\n<p><span>resources of State Grid Shandong Ultra High Voltage Company, Jilin Provincial Power Transmission and Transformation <\/span><\/p>\n<p><span>Engineering Co., Ltd., and domestic equipment manufacturers, and gathered more than 500 technical elites from China and <\/span><\/p>\n<p><span>Brazil to participate in the maintenance work. After careful arrangements, the maintenance strategies and procedures were optimized, <\/span><\/p>\n<p><span>and detailed emergency response measures were formulated to ensure that the entire maintenance process was carried out safely, <\/span><\/p>\n<p><span>orderly and efficiently. This successful maintenance has accumulated valuable experience for the operation and maintenance of large<\/span><\/p>\n<p><span> overseas DC transmission projects.<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>Up to now, the Mera DC transmission project has been operating stably for 1,256 days, with a cumulative transmission of 36.4 billion <\/span><\/p>\n<p><span>kilowatt-hours of electricity. Since it was put into operation, the project has maintained a high availability of more than 98.5%, becoming<\/span><\/p>\n<p><span> a key artery in Pakistan\u2019s \u201cSouth-to-North Power Transmission\u201d strategy, and has been highly recognized and praised by the local <\/span><\/p>\n<p><span>government and owners.<\/span><\/p>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>After the Merah DC Transmission Project in Pakistan was put into commercial operation, the first large-scale comprehensive maintenance work was successfully completed. The maintenance was carried out in the \u201c4+4+2\u2033 bipolar wheel stop and bi<\/p>","protected":false},"author":1,"featured_media":1106,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1345","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/posts\/1345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/comments?post=1345"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/posts\/1345\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/media\/1106"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/media?parent=1345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/categories?post=1345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/de\/wp-json\/wp\/v2\/tags?post=1345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}