{"id":1303,"date":"2025-06-27T00:00:00","date_gmt":"2025-06-27T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/cecc-launches-500kv-transmission-line-project-in-egypt\/"},"modified":"2025-06-27T00:00:00","modified_gmt":"2025-06-27T00:00:00","slug":"cecc-launches-500kv-transmission-line-project-in-egypt","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/es\/news\/cecc-launches-500kv-transmission-line-project-in-egypt\/","title":{"rendered":"CECC lanza el proyecto de l\u00ednea de transmisi\u00f3n de 500kV en Egipto"},"content":{"rendered":"<p><img alt=\"CECC lanza el proyecto de l\u00ednea de transmisi\u00f3n de 500kV en Egipto\" decoding=\"async\" height=\"428\" loading=\"lazy\" src=\"\/assets\/article-restoration\/983f0e9dd707f24353d29abd.webp\" width=\"764\"\/><\/p>\n<p>\u00a0<\/p>\n<div>\n<p>On June 25, local time, CECC and Egyptian National Grid officially signed the EPC contract for the East Ismailia to Zagazig<\/p>\n<p>500 kV Transmission Line Section II and Section III projects. Li Dezhi, Deputy General Manager of CECC MENA Regional<\/p>\n<p>Headquarters, and Mona Rizk, Chairman of the Board of Directors of the State Grid Corporation of Egypt, attended the<\/p>\n<p>signing ceremony on behalf of both parties.<\/p>\n<p>\u00a0<\/p>\n<p>The starting point of Egypt East Ismailia to Zagazig 500 kV transmission line is located in Karjat Elzanayn, Suez Governorate,<\/p>\n<p>and the end point is located in Zagazig 500 kV substation project in Egypt\u2019s Eastern Governorate, with a total length of about<\/p>\n<p>130 kilometers across the desert and farmland areas. Upon completion, the project will make a significant contribution to<\/p>\n<p>Egypt\u2019s optimization of power grid layout and promotion of economic and social development.<br \/>\nThis project is CECC\u2019s first EPC project in the field of ultra-high voltage transmission lines in the Egyptian market, and it is<\/p>\n<p>also the result of the company\u2019s continuous efforts to actively participate in the power transmission and transformation<\/p>\n<p>business in Egypt since 2016, which will lay a solid foundation for the company\u2019s diversified development and continued<\/p>\n<p>development of new business areas in Egypt.<br \/>\nRelevant persons in charge of CEC\u2019s MENA regional headquarters, Egypt Representative Office and Hubei Engineering<\/p>\n<p>Company attended the event.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>On June 25, local time, CECC and Egyptian National Grid officially signed the EPC contract for the East Ismailia to Zagazig 500 kV Transmission Line Section II and Section III projects. Li Dezhi, Deputy General Manager of CECC MENA Regional<\/p>","protected":false},"author":1,"featured_media":1002,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts\/1303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/comments?post=1303"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts\/1303\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/media\/1002"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/media?parent=1303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/categories?post=1303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/tags?post=1303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}