{"id":1331,"date":"2025-09-17T00:00:00","date_gmt":"2025-09-17T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/all-monopiles-installed-at-worlds-largest-offshore-wind-farm\/"},"modified":"2025-09-17T00:00:00","modified_gmt":"2025-09-17T00:00:00","slug":"all-monopiles-installed-at-worlds-largest-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/es\/news\/all-monopiles-installed-at-worlds-largest-offshore-wind-farm\/","title":{"rendered":"Todos los monopilotes instalados en el parque e\u00f3lico marino m\u00e1s grande del mundo"},"content":{"rendered":"<p>Recently, Seaway7\u2032s Seaway Strashnov installed the final monopile at Dogger Bank C in the UK. This wind farm constitutes the third phase<\/p>\n<p>of the 3.6-gigawatt Dogger Bank project and is the world\u2019s largest offshore wind farm currently under construction in the UK.<\/p>\n<div><img alt=\"20250912034320109.png\" decoding=\"async\" height=\"524\" loading=\"lazy\" src=\"\/assets\/article-restoration\/8c44e42fc369dfc08bd5e688.webp\" width=\"784\"\/><\/div>\n<div>\nSeaway7 secured the contract for Dogger Bank A and B in the summer of 2020, followed by the same scope of work for Dogger Bank C the following year.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>Following the completion of all 95 monopiles for Phase 2 of the Dogger Bank wind farm, Seaway Strashnov commenced operations at Dogger Bank C<\/p>\n<p>in April 2025. Over the coming months, Seaway Alfa Lift will continue installing transition pieces to complete Seaway7\u2032s foundation works.<\/p>\n<p>\u00a0<\/p>\n<p>Late last year, Seaway7 signed another vessel booking agreement with the Dogger Bank Wind Farm joint venture\u2014comprising SSE Renewables,<\/p>\n<p>Equinor, and V\u00e5rgr\u00f8nn\u2014to support turbine transport and installation operations.<\/p>\n<p>\u00a0<\/p>\n<p>It is reported that the first two phases of the Dogger Bank wind farm, each with a capacity of 1.2 gigawatts, will install 95 Haliade-X 13-megawatt<\/p>\n<p>wind turbines respectively; the third phase will install 87 Haliade-X 14-megawatt wind turbines.<\/p>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>Recently, Seaway7\u2032s Seaway Strashnov installed the final monopile at Dogger Bank C in the UK. This wind farm constitutes the third phase of the 3.6-gigawatt Dogger Bank project and is the world\u2019s largest offshore wind farm currently under c<\/p>","protected":false},"author":1,"featured_media":1013,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts\/1331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/comments?post=1331"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts\/1331\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/media\/1013"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/media?parent=1331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/categories?post=1331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/tags?post=1331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}