{"id":1397,"date":"2025-05-19T00:00:00","date_gmt":"2025-05-19T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/cec-helps-zambias-largest-photovoltaic-power-plant-financing-to-fall-into-place\/"},"modified":"2025-05-19T00:00:00","modified_gmt":"2025-05-19T00:00:00","slug":"cec-ayuda-a-que-se-concrete-la-financiacion-de-la-mayor-planta-fotovoltaica-de-zambia","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/es\/news\/cec-helps-zambias-largest-photovoltaic-power-plant-financing-to-fall-into-place\/","title":{"rendered":"CEC contribuye a que se concrete la financiaci\u00f3n de la mayor planta fotovoltaica de Zambia"},"content":{"rendered":"<p>El 14 de mayo, hora local, el proyecto de la central fotovoltaica m\u00e1s grande de Zambia: central fotovoltaica Kebwezi Samba de 100 MW<\/p>\n<p>El proyecto alcanz\u00f3 el cierre financiero y la ceremonia de firma se celebr\u00f3 en Lusaka, la capital de Zambia. El proyecto se desarrolla<\/p>\n<p>Por Zambia KNBEPC y CEC, se es responsable de la ejecuci\u00f3n del proyecto. Durante el proceso de financiaci\u00f3n del proyecto, CECC<\/p>\n<p>Aprovech\u00f3 plenamente sus ventajas t\u00e9cnicas, se comunic\u00f3 \u00edntegramente con todas las partes pertinentes del proyecto y contribuy\u00f3 a la<\/p>\n<p>Cierre fluido de la financiaci\u00f3n.<\/p>\n<p>\u00a0<\/p>\n<p>En la ceremonia de firma, Boyd Cancela, director ejecutivo de KNBEPC, destac\u00f3 el importante papel del proyecto para aliviar el suministro el\u00e9ctrico en Zambia,<\/p>\n<p>y afirm\u00f3 plenamente la capacidad t\u00e9cnica de CECC y su capacidad de implementaci\u00f3n de ingenier\u00eda. Dijo que la consecuci\u00f3n del cierre financiero<\/p>\n<p>Es un hito que se celebra y que pone de relieve la capacidad del sector p\u00fablico de Zambia para movilizar capital comercial. El representante de<\/p>\n<p>El comprador de energ\u00eda, Wezzy Gondwe, afirm\u00f3 que el proyecto demuestra los resultados generados por un modelo de negocio s\u00f3lido y la calidad.<\/p>\n<p>socios, y agradeci\u00f3 al equipo de la CEC por sus esfuerzos.<\/p>\n<p>\u00a0<\/p>\n<p>El proyecto de la central el\u00e9ctrica fotovoltaica Kebwe Zisamba est\u00e1 situado cerca de la ciudad de Kebwe, en la Provincia Central de Zambia, con una capacidad instalada<\/p>\n<p>de 100 MW, incluidos el \u00e1rea fotovoltaica, la subestaci\u00f3n de refuerzo, la subestaci\u00f3n de transmisi\u00f3n y las l\u00edneas de transmisi\u00f3n. La finalizaci\u00f3n del proyecto ser\u00e1<\/p>\n<p>Aliviar eficazmente la tensi\u00f3n en el suministro el\u00e9ctrico de Zambia, aumentar a\u00fan m\u00e1s la diversidad de fuentes de energ\u00eda en Zambia y mejorar<\/p>\n<p>Nivel de la fuente de alimentaci\u00f3n.<\/p>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>On May 14, local time, Zambia\u2019s largest photovoltaic power plant project \u2013 Kebwezi Samba 100 MW photovoltaic power plant project achieved financing closure, and the signing ceremony was held in Lusaka, the capital of Zambia. The project is <\/p>","protected":false},"author":1,"featured_media":879,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1397","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts\/1397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/comments?post=1397"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/posts\/1397\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/media\/879"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/media?parent=1397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/categories?post=1397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/es\/wp-json\/wp\/v2\/tags?post=1397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}