{"id":1397,"date":"2025-05-19T00:00:00","date_gmt":"2025-05-19T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/cec-helps-zambias-largest-photovoltaic-power-plant-financing-to-fall-into-place\/"},"modified":"2025-05-19T00:00:00","modified_gmt":"2025-05-19T00:00:00","slug":"cec-helps-zambias-largest-photovoltaic-power-plant-financing-to-fall-into-place","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/hi\/news\/cec-helps-zambias-largest-photovoltaic-power-plant-financing-to-fall-into-place\/","title":{"rendered":"CEC helps Zambia\u2019s largest photovoltaic power plant financing to fall into place"},"content":{"rendered":"<p>On May 14, local time, Zambia\u2019s largest photovoltaic power plant project \u2013 Kebwezi Samba 100 MW photovoltaic power plant<\/p>\n<p>project achieved financing closure, and the signing ceremony was held in Lusaka, the capital of Zambia. The project is developed<\/p>\n<p>by Zambia KNBEPC and CEC is responsible for the project implementation. During the financing process of the project, CECC<\/p>\n<p>gave full play to its technical advantages, fully communicated with all relevant parties of the project, and contributed to the<\/p>\n<p>smooth closing of the financing.<\/p>\n<p>\u00a0<\/p>\n<p>At the signing ceremony, Boyd Cancela, CEO of KNBEPC, emphasized the great role of the project in easing Zambia\u2019s power supply,<\/p>\n<p>and fully affirmed CECC\u2019s technical capability and engineering implementation capacity. He said the achievement of financing closure<\/p>\n<p>is a proud milestone that highlights the ability of the Zambian public sector to mobilize commercial capital. The representative of<\/p>\n<p>the power purchaser, Wezzy Gondwe, said that the project demonstrates the results created by a sound business model and quality<\/p>\n<p>partners, and thanked the CEC team for their efforts.<\/p>\n<p>\u00a0<\/p>\n<p>The Kebwe Zisamba PV power plant project is located near the city of Kebwe in Zambia\u2019s Central Province, with an installed capacity<\/p>\n<p>of 100 MW, including PV area, booster station, transmission substation and transmission lines. The completion of the project will<\/p>\n<p>effectively alleviate the tension of Zambia\u2019s power supply, further increase the diversity of energy sources in Zambia and enhance<\/p>\n<p>the level of power supply.<\/p>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>On May 14, local time, Zambia\u2019s largest photovoltaic power plant project \u2013 Kebwezi Samba 100 MW photovoltaic power plant project achieved financing closure, and the signing ceremony was held in Lusaka, the capital of Zambia. The project is <\/p>","protected":false},"author":1,"featured_media":879,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1397","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/posts\/1397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/comments?post=1397"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/posts\/1397\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/media\/879"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/media?parent=1397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/categories?post=1397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/tags?post=1397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}