{"id":1408,"date":"2025-08-15T00:00:00","date_gmt":"2025-08-15T00:00:00","guid":{"rendered":"https:\/\/ylu6kzueag.wpdns.site\/news\/china-power-construction-starts-waste-heat-boiler-project-in-singapore\/"},"modified":"2025-08-15T00:00:00","modified_gmt":"2025-08-15T00:00:00","slug":"china-power-construction-starts-waste-heat-boiler-project-in-singapore","status":"publish","type":"post","link":"https:\/\/www.yojiuelec.com\/hi\/news\/china-power-construction-starts-waste-heat-boiler-project-in-singapore\/","title":{"rendered":"China Power Construction Starts Waste Heat Boiler Project in Singapore"},"content":{"rendered":"<div>\n<div>\n<p><img alt=\"China Power Construction Starts Waste Heat Boiler Project in Singapore.png\" decoding=\"async\" height=\"365\" loading=\"lazy\" src=\"\/assets\/article-restoration\/7e422c10cd263f4ee43b0b9f.webp\" width=\"803\"\/><\/p>\n<p>The precise installation of the first steel structure column for the waste heat boiler marks the official launch of the main structure<\/p>\n<p>installation phase of the project, laying a solid foundation for the overall construction. To ensure the safety and efficiency of the<\/p>\n<p>lifting operation, the project team conducted specialized technical briefings and safety training in advance to ensure that all<\/p>\n<p>personnel were familiar with the operational procedures and safety requirements; comprehensive inspections were carried<\/p>\n<p>out on the lifting equipment, rigging, and on-site environment to eliminate potential risks and hazards. During the lifting process,<\/p>\n<p>the workers strictly followed the established plan, ensuring the column was lifted smoothly and precisely into place, demonstrating<\/p>\n<p>exceptional professional competence and earning high praise from the client and consultants.<\/p>\n<p>\u00a0<\/p>\n<p>With the successful installation of the first steel structure column, the installation work for the waste heat boiler will officially begin.<\/p>\n<p>The project manager from China Electric Power Construction Corporation stated at the ceremony that the project team will<\/p>\n<p>continue to adhere to the principles of \u201chigh standards, strict requirements, meticulous attention to detail, and practical<\/p>\n<p>implementation,\u201d approaching the task with enthusiasm and rigor to ensure the high-quality, efficient, and timely completion<\/p>\n<p>of the project\u2019s subsequent construction tasks.<\/p>\n<p>\u00a0<\/p>\n<p>The Singapore CCP50 600-megawatt combined-cycle power plant EPC project marks China Electric Power Construction<\/p>\n<p>Corporation\u2019s first participation in a gas-fired power plant EPC turnkey project in a developed country, representing a<\/p>\n<p>significant breakthrough for the company in the power market of developed nations.<\/p>\n<p>\u00a0<\/p>\n<p>On the morning of August 11 local time, the main structure hoisting work for the waste heat boiler of the 600 MW combined<\/p>\n<p>cycle power plant project in Singapore was successfully launched. Representatives from the owner, China Electric Power<\/p>\n<p>Construction Corporation Singapore Representative Office, and the project management team attended the launch<\/p>\n<p>ceremony together.<\/p>\n<\/div>\n<\/div>\n<div><\/div>","protected":false},"excerpt":{"rendered":"<p>The precise installation of the first steel structure column for the waste heat boiler marks the official launch of the main structure installation phase of the project, laying a solid foundation for the overall construction. To ensure the <\/p>","protected":false},"author":1,"featured_media":1012,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1408","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/posts\/1408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/comments?post=1408"}],"version-history":[{"count":0,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/posts\/1408\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/media\/1012"}],"wp:attachment":[{"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/media?parent=1408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/categories?post=1408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yojiuelec.com\/hi\/wp-json\/wp\/v2\/tags?post=1408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}