China Factory for Spindle - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We also present product or service sourcing and flight consolidation products and services. We have our possess manufacturing facility and sourcing place of work. We can easily supply you with almost every type of product or service connected to our item variety for Overhead Power Line Accessories, Eye Bolt, Electric Wire Fitting, Good quality would be the key factor to the company to stand out from other competitors. Seeing is Believing, want far more info? Just trial on its items!
China Factory for Spindle - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu Detail:

The AC-O-06 and AC-O-07 Dead End Clamp are applicable to fix the self-supporting insulated cable.
Clamp body is made of corrosion resistant aluminium alloy with high mechanical strength and bail is made of stainless steel.
Wedges are made of weather resistant material
No special tools are required.

Dead End Clamp Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-07-500

16-25

3-7

7

AC-O-10-500

16-25

6-10

10

Description:
The anchor clamp is designed to anchor insulated main line with 4 conductors to the Pole, or service lines with 2 or 4 conductors to the pole or wall. The clamp is composed of a body, wedges and removable and adjustable bail or pad.
One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting. Good corrosion resistance, use high quality materials. The quality of the installation of anchoring clamp is guaranteed.

Features:
Tool free installation with wedges sliding inside the body.
Easy to open bail permits fixing to brackets and pigtails.
Adjustable length of bail in three steps.
high mechanical stability.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole, the wedges move further onto the clamp body. When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable. Any questions just contact us freely.cessarily the lowest, they must be the most valuable. Any questions just contact us freely.


Product detail pictures:

China Factory for Spindle - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

To be the stage of realizing dreams of our employees! To build a happier, far more united and far more specialist team! To reach a mutual profit of our customers, suppliers, the society and ourselves for China Factory for Spindle - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Naples, Zurich, Luxembourg, We have more than 100 works in the plant, and we also have a 15 guys work team to service our customers for before and after sales. Good quality is the key factor for the company to stand out from other competitors. Seeing is Believing, want more information? Just trial on its products!
  • The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Roxanne from Madagascar - 2018.02.12 14:52
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Emma from Bulgaria - 2017.03.08 14:45
    Write your message here and send it to us