Factory For Electric Wire Fitting - AC-O-06 and AC-O-07 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking to the principle of "Super High-quality, Satisfactory service" ,We are striving to generally be a very good business partner of you for Shrink Tube, Wedge Clamp, Fiber Optic Tension Clamp, We are always looking forward to forming successful business relationships with new clients around the world.
Factory For Electric Wire Fitting - AC-O-06 and AC-O-07 Dead End Clamp – Yongjiu Detail:

The AC-O-06 and AC-O-07 Dead End Clamp are applicable to fix the self-supporting insulated cable.
Clamp body is made of corrosion resistant aluminium alloy with high mechanical strength and bail is made of stainless steel.
Wedges are made of weather resistant material
No special tools are required.

DC Cable ClampSquare Cable Clamp

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-06

16-25

3-6

3

AC-O-07

16-35

3-7

5

Dead end clamp has high strength and reliable grip.
A pair of wedges grips the cable automatically within the conical body.One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting.The installation does not require any specific tools and the operating time is drastically reduced.
The stress distribution of anchoring clamp to the twisted wire is uniform. The twisted wire is not damaged, and the anti-vibration ability of the twisted wire is improved.
Simple installation and easy construction.
Easy to open bail permits fixing to brackets and pigtails.
Adjustable length of bail in three steps.
The quality of the installation of anchoring clamp is guaranteed
Good corrosion resistance, use high quality materials.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole,the wedges move further onto the clamp body.When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable.Any questions just contact us freely.


Product detail pictures:

Factory For Electric Wire Fitting - AC-O-06 and AC-O-07 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

Our goods are commonly recognized and reliable by consumers and may satisfy continually developing economic and social needs for Factory For Electric Wire Fitting - AC-O-06 and AC-O-07 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Mauritius, Holland, Turkey, Our company will continue to adhere to the " superior quality, reputable, the user first " principle wholeheartedly. We warmly welcome friends from all walks of life to visit and give guidance, work together and create a brilliant future!
  • The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
    5 Stars By John biddlestone from Liberia - 2017.03.28 12:22
    We have worked with many companies, but this time is the best,detailed explanation, timely delivery and quality qualified, nice!
    5 Stars By Eve from British - 2018.12.28 15:18
    Write your message here and send it to us