Factory making Lv Abc Accessories - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our aim is usually to give superior quality items at aggressive rates, and top-notch company to clients around the earth. We have been ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for Copper Earth Rod, Thimble Clevis, Wire Clamp, We are willing to give you the best suggestions on the designs of your orders in a professional way if you need. In the meantime, we keep on developing new technologies and creating new designs so as to make you ahead in the line of this business.
Factory making Lv Abc Accessories - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu Detail:

The AC-O-06 and AC-O-07 Dead End Clamp are applicable to fix the self-supporting insulated cable.
Clamp body is made of corrosion resistant aluminium alloy with high mechanical strength and bail is made of stainless steel.
Wedges are made of weather resistant material
No special tools are required.

Dead End Clamp Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-07-500

16-25

3-7

7

AC-O-10-500

16-25

6-10

10

Description:
The anchor clamp is designed to anchor insulated main line with 4 conductors to the Pole, or service lines with 2 or 4 conductors to the pole or wall. The clamp is composed of a body, wedges and removable and adjustable bail or pad.
One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting. Good corrosion resistance, use high quality materials. The quality of the installation of anchoring clamp is guaranteed.

Features:
Tool free installation with wedges sliding inside the body.
Easy to open bail permits fixing to brackets and pigtails.
Adjustable length of bail in three steps.
high mechanical stability.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole, the wedges move further onto the clamp body. When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable. Any questions just contact us freely.cessarily the lowest, they must be the most valuable. Any questions just contact us freely.


Product detail pictures:

Factory making Lv Abc Accessories - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Factory making Lv Abc Accessories - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Sydney, Ethiopia, Singapore, As an experienced manufacturer we also accept customized order and we could make it the same as your picture or sample specification. The main goal of our company is to live a satisfactory memory to all the customers, and establish a long term business relationship with buyers and users all over the world.
  • The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Fernando from Pretoria - 2018.10.09 19:07
    In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
    5 Stars By Sophia from Madras - 2018.06.18 17:25
    Write your message here and send it to us