Factory Price Ball Eye - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our enterprise since its inception, often regards solution excellent as enterprise life, continually strengthen output technology, enhance product high quality and continually strengthen organization total high-quality administration, in strict accordance using the national standard ISO 9001:2000 for Preformed Guy Grips, Bracket, Cable Terminal, Our tenet is evident all of the time: to deliver high quality solution at competitive price tag to clients throughout the planet. We welcome potential customers to get in touch with us for OEM and ODM orders.
Factory Price Ball Eye - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu Detail:

The AC-O-06 and AC-O-07 Dead End Clamp are applicable to fix the self-supporting insulated cable.
Clamp body is made of corrosion resistant aluminium alloy with high mechanical strength and bail is made of stainless steel.
Wedges are made of weather resistant material
No special tools are required.

Dead End Clamp Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-07-500

16-25

3-7

7

AC-O-10-500

16-25

6-10

10

Description:
The anchor clamp is designed to anchor insulated main line with 4 conductors to the Pole, or service lines with 2 or 4 conductors to the pole or wall. The clamp is composed of a body, wedges and removable and adjustable bail or pad.
One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting. Good corrosion resistance, use high quality materials. The quality of the installation of anchoring clamp is guaranteed.

Features:
Tool free installation with wedges sliding inside the body.
Easy to open bail permits fixing to brackets and pigtails.
Adjustable length of bail in three steps.
high mechanical stability.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole, the wedges move further onto the clamp body. When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable. Any questions just contact us freely.cessarily the lowest, they must be the most valuable. Any questions just contact us freely.


Product detail pictures:

Factory Price Ball Eye - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

High-quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is constantly observed and pursued by our business for Factory Price Ball Eye - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Mozambique, Kenya, Mumbai, Now, we are trying to enter new markets where we do not have a presence and developing the markets we have the already penetrated. On account of superior quality and competitive price , we will be the market leader, please don’t hesitate to contact us by phone or email, if you are interested in any of our products.
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Jill from London - 2018.06.12 16:22
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Poppy from Florence - 2018.12.28 15:18
    Write your message here and send it to us