PriceList for Supplier Ftth - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our mission will be to become an innovative supplier of high-tech digital and communication devices by furnishing benefit added structure, world-class manufacturing, and service capabilities for Bolted Tension Clamp, Cable Joint Kits, Tubular Terminals, If you are interested in any of our products and services, please don't hesitate to contact us. We are ready to reply you within 24 hours after receipt of your request and to create mutual un-limited benefits and business in near future.
PriceList for Supplier Ftth - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu Detail:

The AC-O-05 UV Protect Dead End Clamp is designed for a fast, easy and reliable dead-ending of fiber optic cables on access networks with spans up to 100 m.

A pair of wedges grips the cable automatically within the conical body.

No special tools are required.

•   Standard: NFC33-042

Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-05

16-25

3-7

3

AC-O-08

16-25

6-8

4

AC-O-10

16-25

8-10

5

Dead end clamp has high strength and reliable grip.
A pair of wedges grips the cable automatically within the conical body.One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting.The installation does not require any specific tools and the operating time is drastically reduced.
The stress distribution of anchoring clamp to the twisted wire is uniform. The twisted wire is not damaged, and the anti-vibration ability of the twisted wire is improved.
Simple installation and easy construction.
The quality of the installation of anchoring clamp is guaranteed
Good corrosion resistance, use high quality materials.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole,the wedges move further onto the clamp body.When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable.Any questions just contact us freely.


Product detail pictures:

PriceList for Supplier Ftth - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

To be able to give you benefit and enlarge our business, we also have inspectors in QC Team and assure you our greatest service and products for PriceList for Supplier Ftth - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Salt Lake City, Bulgaria, South Africa, Being the top solutions of our factory, our solutions series have been tested and won us experienced authority certifications. For additional parameters and item list details, be sure to click the button to acquire additional nformation.
  • The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Carey from Monaco - 2017.08.15 12:36
    The customer service staff's answer is very meticulous, the most important is that the product quality is very good, and packaged carefully, shipped quickly!
    5 Stars By Alexandra from Rome - 2017.02.28 14:19
    Write your message here and send it to us