New Arrival China Tension Bracket - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We pursue the administration tenet of "Quality is remarkable, Services is supreme, Status is first", and will sincerely create and share success with all customers for Cable Sleeve, Aluminium Cable Clamp, Aluminum Parallel Groove Clamp, We look forward to supplying you with our products in the near future, and you will find our quotation is very reasonable and the quality of our products is very excellent!
New Arrival China Tension Bracket - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu Detail:

The AC-O-06 and AC-O-07 Dead End Clamp are applicable to fix the self-supporting insulated cable.
Clamp body is made of corrosion resistant aluminium alloy with high mechanical strength and bail is made of stainless steel.
Wedges are made of weather resistant material
No special tools are required.

Dead End Clamp Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-07-500

16-25

3-7

7

AC-O-10-500

16-25

6-10

10

Description:
The anchor clamp is designed to anchor insulated main line with 4 conductors to the Pole, or service lines with 2 or 4 conductors to the pole or wall. The clamp is composed of a body, wedges and removable and adjustable bail or pad.
One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting. Good corrosion resistance, use high quality materials. The quality of the installation of anchoring clamp is guaranteed.

Features:
Tool free installation with wedges sliding inside the body.
Easy to open bail permits fixing to brackets and pigtails.
Adjustable length of bail in three steps.
high mechanical stability.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole, the wedges move further onto the clamp body. When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable. Any questions just contact us freely.cessarily the lowest, they must be the most valuable. Any questions just contact us freely.


Product detail pictures:

New Arrival China Tension Bracket - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

Every member from our high efficiency sales team values customers' needs and business communication for New Arrival China Tension Bracket - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Southampton, Marseille, Kuwait, With its rich manufacturing experience, high-quality products, and perfect after-sale service, the company has gained good reputation and has become one of the famous enterprise specialized in manufacturing series.We sincerely hope to establish business relation with you and pursue mutual benefit.
  • The company's products can meet our diverse needs, and the price is cheap, the most important is that the quality is also very nice.
    5 Stars By Claire from South Africa - 2018.05.13 17:00
    The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
    5 Stars By Rosemary from Greece - 2018.05.15 10:52
    Write your message here and send it to us