Factory Supply Aluminum Tube - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" as well as the theory of "quality the basic, believe in the 1st and management the advanced" for Ipc Connector, Groove Clamp, Copper Cable Terminal, We, with great passion and faithfulness, are willing to provide you with perfect services and striding forward with you to create a bright future.
Factory Supply Aluminum Tube - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu Detail:

The AC-O-06 and AC-O-07 Dead End Clamp are applicable to fix the self-supporting insulated cable.
Clamp body is made of corrosion resistant aluminium alloy with high mechanical strength and bail is made of stainless steel.
Wedges are made of weather resistant material
No special tools are required.

Dead End Clamp Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-07-500

16-25

3-7

7

AC-O-10-500

16-25

6-10

10

Description:
The anchor clamp is designed to anchor insulated main line with 4 conductors to the Pole, or service lines with 2 or 4 conductors to the pole or wall. The clamp is composed of a body, wedges and removable and adjustable bail or pad.
One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting. Good corrosion resistance, use high quality materials. The quality of the installation of anchoring clamp is guaranteed.

Features:
Tool free installation with wedges sliding inside the body.
Easy to open bail permits fixing to brackets and pigtails.
Adjustable length of bail in three steps.
high mechanical stability.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole, the wedges move further onto the clamp body. When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable. Any questions just contact us freely.cessarily the lowest, they must be the most valuable. Any questions just contact us freely.


Product detail pictures:

Factory Supply Aluminum Tube - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

We insist on offering premium quality creation with very good company concept, honest product sales along with the finest and fast assistance. it will bring you not only the premium quality item and huge profit, but the most significant is to occupy the endless market for Factory Supply Aluminum Tube - AC-O-07-500 and AC-O-10-500 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Hungary, Sevilla, Luxembourg, The company has perfect management system and after-sales service system. We devote ourselves to building a pioneer in the filter industry. Our factory is willing to cooperate with different customers domestic and overseas to gain better and better future.
  • It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Audrey from Oman - 2017.01.28 19:59
    With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
    5 Stars By Marguerite from Adelaide - 2017.12.19 11:10
    Write your message here and send it to us